IncorrectCostforWIPAssemblyReturn1-成都创新互联网站建设

关于创新互联

多方位宣传企业产品与服务 突出企业形象

公司简介 公司的服务 荣誉资质 新闻动态 联系我们

IncorrectCostforWIPAssemblyReturn1

Incorrect Cost for WIP Assembly Return 1

Incorrect Costs For Wip Assembly Return To Discrete Job Using Average Costing (文档 ID 788680.1) Incorrect Cost for WIP Assembly Return 1

In this Document

目前累计服务客户上1000+,积累了丰富的产品开发及服务经验。以网站设计水平和技术实力,树立企业形象,为客户提供成都网站制作、网站建设、外贸网站建设、网站策划、网页设计、网络营销、VI设计、网站改版、漏洞修补等服务。创新互联公司始终以务实、诚信为根本,不断创新和提高建站品质,通过对领先技术的掌握、对创意设计的研究、对客户形象的视觉传递、对应用系统的结合,为客户提供更好的一站式互联网解决方案,携手广大客户,共同发展进步。


Symptoms

Changes

Cause

Solution

References

Applies to:

Oracle Cost Management - Version 11.5.10.2 to 12.1.3 [Release 11.5 to 12.1]
Information in this document applies to any platform.

Symptoms


Find using the average cost method and our orgs are Project Manufacturing enabled. WIP Assembly returns to a job are supposed to be costs at the average unit value for completions from that job.
Material was issued to the job in the AUG-08 period at $2,774.81 and the job was fully completed (8 ea) at the same total cost in the same period.
In the following period (SEP-08), OSP resource costs of $1800 were received to the job. In an attempt to absorb this additional cost, all 8 were returned using the WIP Assembly return
transaction then all 8 were completed again using WIP Assy Completion transaction. Oracle costed the WIP assembly return at $0 cost.
This is incorrect. It should have returned 8 at $2,774.81 for a unit cost of $346.85. Then, the 2nd WIP assembly completion was costed at $4,574.81 ($2,774.81 + $1800) Essentially, the $2,774.81 material cost on the job was absorbed to inventory twice

EXPECTED BEHAVIOR
Expect ...8 returned at $2,774.81 for a unit cost of $346.85

-- Steps To Reproduce:
The issue can be reproduced at will with the following steps:
1. Open a standard discrete job in a manufacturing org using average cost method.
The routing should have an OSP resource requirement. the BOM should have one costed material component.
2. Issue material to the job and fully complete the job in one accounting period.
3. Close the accounting period
4. Receive OSP resource costs in the next period.
5. Do a WIP assembly return of all quantity completed. Then, do another final WIP assy completion

Changes

 

Cause

Code Issue

The material costs incurred against some operations (new operations) were not being relieved through the completion transactions

Solution

EBS 11.5.10.X

-- To implement the solution, please execute the following steps:


1. Download and review the readme and pre-requisites for Patch 7520866

bom  patch/115/sql  CSTLCACB.pls  115.6.115100.6 
bom  patch/115/sql  CSTLCASB.pls  115.3.115100.4 
bom  patch/115/sql  CSTPACCB.pls  115.17.115100.12 
bom  patch/115/sql  CSTPACSB.pls  115.8.115100.8


You can use the commands like the following:
strings -a $BOM_TOP/filename |grep '$Header'

5. Retest the issue.

6. Migrate the solution as appropriate to other environments.

---------------------------------------------------------------------


EBS 12.1.X

To implement the solution, please execute the following steps:


1) Please download and review the readme for Patch 11805897:R12.BOM.C


2) Please apply Patch 11805897:R12.BOM.C in a test environment.


3) Please confirm the following file versions:
CSTPACCB.pls 120.8.12010000.8
CSTPACSB.pls 120.2.12010000.4
CSTLCACB.pls 120.2.12010000.4
CSTLCASB.pls 120.1.12010000.3


4) Please retest the issue.


5) If the issue is resolved, please migrate the solution as appropriate to other environments.



文章标题:IncorrectCostforWIPAssemblyReturn1
当前网址:http://kswsj.cn/article/igigch.html

其他资讯